Magic Kingdom Lift Station 7 Rehabilitation & Upgrade
Sector: Water Supply and Storage • Location: Orlando, Florida, United States of America
Source: Dodge USA
1.1 The scope of work for the Lift Station #7 Rehabilitation & Upgrade Improvements includes, but is not limited to: a. Replace existing submersible pumps b. Provide a diesel backup pump for emergency pumping capabilities in lieu of engine generator c. Replace existing fuel storage tank d. Provide epoxy lining system to wetwell walls and ceiling for coatings rehabilitation e. Provide full station
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Government, Consumer Products
- Location
- Orlando, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Magic Kingdom Lift Station 7 Rehabilitation & Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1.1 The scope of work for the Lift Station #7 Rehabilitation & Upgrade Improvements includes, but is not limited to: a. Replace existing submersible pumps b. Provide a diesel backup pump for emergency pumping capabilities in lieu of engine generator c. Replace existing fuel storage tank d. Provide epoxy lining system to wetwell walls and ceiling for coatings rehabilitation e. Provide full station bypass during coatings work and other critical rehabilitation work inside the wetwell f. Provide ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Orlando |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Government, Consumer Products |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
