Magnolia Dearman Drainage Improvements
Sector: Water Supply and Storage • Location: Long Beach, Mississippi, United States of America
Source: Dodge
The project generally consists of removing and replacing approximately 200 linear feet of an existing drainage culvert, along with construction of two concrete headwalls and miscellaneous site work and restoration.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Raw Materials, Waste Processing and Treatment, Commercial
- Location
- Long Beach, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Magnolia Dearman Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project generally consists of removing and replacing approximately 200 linear feet of an existing drainage culvert, along with construction of two concrete headwalls and miscellaneous site work and restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Long Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Raw Materials, Waste Processing and Treatment, Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
