Magnuson Building 12 Stabilization
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
Stabilize historic Magnuson Park Building #12 which is an old central steam boiler plant and a contributing structure to the Sand Point Naval Air Station Landmark Preservation District, including Non-structural Roof Replacement, Paint Metal Roof Deck, Asbestos Abatement, Window Coverings, Roof Access Ladder, South Elevation Masonry Repairs, Storm Sewer Piping Modifications, Equipment Removal, Elec
- Status
- Closed
- Sector
- Commercial, Metal, Water Supply and Storage, Cement, Power Transmission, Residential, Waste Processing and Treatment, Car parking, Power Generation (CCGT), Automotive, Government, Manufacturing (Industrial)
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Magnuson Building 12 Stabilization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Stabilize historic Magnuson Park Building #12 which is an old central steam boiler plant and a contributing structure to the Sand Point Naval Air Station Landmark Preservation District, including Non-structural Roof Replacement, Paint Metal Roof Deck, Asbestos Abatement, Window Coverings, Roof Access Ladder, South Elevation Masonry Repairs, Storm Sewer Piping Modifications, Equipment Removal, Electrical Service and Utility Panel and Strong Backs for URF. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Water Supply and Storage, Cement, Power Transmission, Residential, Waste Processing and Treatment, Car parking, Power Generation (CCGT), Automotive, Government, Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
