Mahinahina Water Treatment Plant Backwash Tank Replacement
One of 8,561 projects Taiyo tracks in Hawaii.
Source: Dodge
The project involves furnishing all labor, tools, materials and equipment as necessary to remove and replace existing 0.1 MG steel backwash tank, construct a temporary 94,000 gallon backwash tank with associated grading and remove and install approximately 435 LF of existing chain link fencing and associated fence posts, in place complete.
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Government, Waste Processing and Treatment, Commercial, Metal
- Location
- Honolulu, Hawaii, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mahinahina Water Treatment Plant Backwash Tank Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves furnishing all labor, tools, materials and equipment as necessary to remove and replace existing 0.1 MG steel backwash tank, construct a temporary 94,000 gallon backwash tank with associated grading and remove and install approximately 435 LF of existing chain link fencing and associated fence posts, in place complete. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Honolulu |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Waste Processing and Treatment, Commercial, Metal |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
