Mahindra Solar Power Plant
Sector: Solar • Location: India
Source: World Bank Group
The project entails the construction of a solar power plant in Rewa District of Madhya Pradesh, India. The intiative is part of the 750 MW Rewa solar park and the new facility has a total capacity of 250 MW.
The plant is expected to generate over 525 million units. Mahindra Renewables had participated in the competitive bidding process invited by Rewa Ultra Mega Solar Ltd. (50:50 JV between Mad
- Status
- Prospective
- Sector
- Solar, Mass Transit, Car parking, Power Generation (CCGT), Rail, Government, Automotive, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Mahindra Solar Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of a solar power plant in Rewa District of Madhya Pradesh, India. The intiative is part of the 750 MW Rewa solar park and the new facility has a total capacity of 250 MW. The plant is expected to generate over 525 million units. Mahindra Renewables had participated in the competitive bidding process invited by Rewa Ultra Mega Solar Ltd. (50:50 JV between Madhya Pradesh Urja Vikash Nigam Ltd. & Solar Energy Corporation of India) to set up 750 MW grid connected Solar PV projects. Mahindra Renewables won 250 MW capacity at levelised tariff of INR 3.3 per Kwh with other winning bidders being ACTIS PE backed Solenergi and ACME Group. The off-takers for the Project will be Madhya Pradesh Power Management Company Limited (“MPPMCL”) and Delhi Metro Rail Corporation (“DMRC”). The debt financing is being provided by Yes Bank to the extent of INR 750 Crores ($115.34 million) and from other financial institutions up to INR 200 Crores ($30.77 million). IFC has also provided $51.09 million. The project is expected to commence commercial operations by December 2018. The financial close took place on March 17, 2018. http://www.climatesamurai.com/solar/mahindra-renewable-achieves-financial-closure-for-250-mw-solar-power-project-in-mp/ https://www.thehindu.com/business/rewa-plant-mahindra-arm-achieves-financial-closure/article23281318.ece |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Mass Transit, Car parking, Power Generation (CCGT), Rail, Government, Automotive, Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
