Maiduguri Emergency Power Project
Sector: Power Generation (CCGT) • Location: Maiduguri, Borno, Nigeria
Source: Vanguard News
A 50 MW gas-fired power plant in Maiduguri, Borno State, commissioned on March 2, 2023, built jointly by NNPC Ltd., General Electric, and China Machinery Engineering Company. The project was initiated to restore power to Maiduguri and its environs after prolonged darkness due to Boko Haram attacks on power facilities.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Maiduguri, Borno, Nigeria
- Updated
- 22 Jul 2026
- Source
- Vanguard News
ConstructChat
Ask ConstructChat about Maiduguri Emergency Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 50 MW gas-fired power plant in Maiduguri, Borno State, commissioned on March 2, 2023, built jointly by NNPC Ltd., General Electric, and China Machinery Engineering Company. The project was initiated to restore power to Maiduguri and its environs after prolonged darkness due to Boko Haram attacks on power facilities. |
Original sector | Energy |
Location
Country | Nigeria |
State | Borno |
City | Maiduguri |
Source
Source | Vanguard News |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
