logo
ProjectUnder Construction

Mailo Solar Power Plant Phase 2

The owner, status and timeline of this project. A free account opens every field.

Source: pv magazine International

The second phase of the Mailo solar project consists of a further 35 MW currently under construction and due to reach capacity within a few months. Financing for this phase has been secured via a $40 million loan from Standard Bank.

Status
Under Construction
Sector
Solar, Power Generation (CCGT)
Location
Zambia
Updated
22 Jul 2026
Source
pv magazine International

ConstructChat

Ask ConstructChat about Mailo Solar Power Plant Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Mailo Solar Power Plant Phase 2” is an infrastructure initiative in the Solar sector, located in Zambia. Taiyo aggregates data on it from pv magazine International.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The second phase of the Mailo solar project consists of a further 35 MW currently under construction and due to reach capacity within a few months. Financing for this phase has been secured via a $40 million loan from Standard Bank.

Original sector

Energy

Budget

Location

Country

Zambia

Source

Source

pv magazine International

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project