Mailo Solar Power Plant Phase 2
The owner, status and timeline of this project. A free account opens every field.
Source: pv magazine International
The second phase of the Mailo solar project consists of a further 35 MW currently under construction and due to reach capacity within a few months. Financing for this phase has been secured via a $40 million loan from Standard Bank.
- Status
- Under Construction
- Sector
- Solar, Power Generation (CCGT)
- Location
- Zambia
- Updated
- 22 Jul 2026
- Source
- pv magazine International
ConstructChat
Ask ConstructChat about Mailo Solar Power Plant Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The second phase of the Mailo solar project consists of a further 35 MW currently under construction and due to reach capacity within a few months. Financing for this phase has been secured via a $40 million loan from Standard Bank. |
Original sector | Energy |
Budget |
Location
Country | Zambia |
Source
Source | pv magazine International |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Zambia
- Development of the 118.4MW Hydro Electricity Plant and Associated Transmission Facilities in Zambia
- Luswishi Farm Project
- Chingombe solar mini-grid project
- Shangombo Sugar Project
- Sikaunzwe Solar Mini-Grid Project
- Tomato and Vegetable Growing Project
- Charcoal Briquettes Making Project
- Kalolwa Solar Mini Grid
