logo
ProjectCompleted

Main Gate Microgrid with Battery Backup Project

The owner, status and timeline of this project. A free account opens every field.

Source: DVIDS

The Main Gate Microgrid with Battery Backup Project at Fort McCoy is a $1.4 million investment designed to ensure uninterrupted operations for critical facilities near the Main Gate during commercial power outages. The microgrid can provide a minimum of 14 days of continuous operations and allows the Main Gate and surrounding mission-essential facilities to function independently in island mode wh

Status
Closed
Sector
Energy Storage, Power Generation (CCGT), Power Transmission, Commercial
Location
Fort McCoy, Wisconsin, United States of America
Updated
22 Jul 2026
Source
DVIDS

ConstructChat

Ask ConstructChat about Main Gate Microgrid with Battery Backup Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Main Gate Microgrid with Battery Backup Project” is an infrastructure initiative in the Energy Storage sector, located in Fort McCoy, Wisconsin, United States. Taiyo aggregates data on it from DVIDS.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Main Gate Microgrid with Battery Backup Project at Fort McCoy is a $1.4 million investment designed to ensure uninterrupted operations for critical facilities near the Main Gate during commercial power outages. The microgrid can provide a minimum of 14 days of continuous operations and allows the Main Gate and surrounding mission-essential facilities to function independently in island mode when the primary electrical grid is unavailable. The system also generates approximately $20,000 in annual energy savings by reducing electricity use during peak demand periods and offsetting utility power imports.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Fort McCoy

Source

Source

DVIDS

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Power Transmission, Commercial

Article published date

2026-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project