Main Lift Station Replacement
Sector: Power Generation (CCGT) • Location: Farmington, Wisconsin, United States of America
Source: Dodge USA
The work for this project will be performed at the site of the existing Town of Farmington SD Main Sewage Lift Station. This Contract shall include all labor and equipment including general, mechanical, electrical, and instrumentation work. The work includes spot repairs to the east of the Main Lift Station on North Street, and to south of the Main Lift Station in an easement. The Contractor shall
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Farmington, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Main Lift Station Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work for this project will be performed at the site of the existing Town of Farmington SD Main Sewage Lift Station. This Contract shall include all labor and equipment including general, mechanical, electrical, and instrumentation work. The work includes spot repairs to the east of the Main Lift Station on North Street, and to south of the Main Lift Station in an easement. The Contractor shall be responsible for constructing, modifying, and maintaining in service the sewage system associa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Farmington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
