Main Pump Station Modifications
Sector: Water Supply and Storage • Location: Northlake, Illinois, United States of America
Source: Dodge
The project in general consists of demolishing the Owner's existing 3.0 million gallon steel ground storage reservoir, furnishing and installing a new 3.0 million gallon glass coated, bolted steel reservoir, complete renovation of the pump station including new replacement pumps and motors, piping and valves, electrical gear and variable frequency drives (VFDs), chlorine system, SCADA modification
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Government, Natural Gas, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Metal
- Location
- Northlake, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Main Pump Station Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project in general consists of demolishing the Owner's existing 3.0 million gallon steel ground storage reservoir, furnishing and installing a new 3.0 million gallon glass coated, bolted steel reservoir, complete renovation of the pump station including new replacement pumps and motors, piping and valves, electrical gear and variable frequency drives (VFDs), chlorine system, SCADA modifications, new natural gas standby generator in new building, and all other related appurtenances and acc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Northlake |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Natural Gas, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Metal |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
