logo
ProjectClosed

Main Pumping Station Force Main Replacement

Closed · Alabama · Last reported Nov 2024

Source: Dodge USA

MAIN PUMPING STATION FORCE MAIN REPLACEMENT: The work generally consists of the following items of work: 4,900 linear feet of 18" PE force main, 1,620 linear feet of 18" PE force main directional drilled, 100 linear feet of 30" steel casing bored under the railroad, modification of lagoon influent structure, and other related items.CONTRACT NO. 2 MAIN PUMPING STATION FORCE MAIN REPLACEMENT: The wo

Status
Closed
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Rail, Government, Steel, Metal
Location
Brewton, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Main Pumping Station Force Main Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Main Pumping Station Force Main Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Brewton, Alabama, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

MAIN PUMPING STATION FORCE MAIN REPLACEMENT: The work generally consists of the following items of work: 4,900 linear feet of 18" PE force main, 1,620 linear feet of 18" PE force main directional drilled, 100 linear feet of 30" steel casing bored under the railroad, modification of lagoon influent structure, and other related items.CONTRACT NO. 2 MAIN PUMPING STATION FORCE MAIN REPLACEMENT: The work generally consists of the following items of work: 4,900 linear feet of 18 PE force main, 1,62...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Brewton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Rail, Government, Steel, Metal

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project