Main Pumping Station Upgrade
One of 10,000+ projects Taiyo tracks in Alabama.
Source: Dodge USA
CONTRACT NO. 1 MAIN PUMPING STATION UPGRADES: The work generally consists of the purchasing and installation of the following: 60 HP Tri-Plex Non-Clog Pumps Equipment; 3- 10 Weighted Arm Check Valves Equipment; 18 Flow Meter Equipment; 18 Plug Valve Equipment; 18 Bypassing Pumping Connection Equipment; Generator; Electrical Modifications; and other related items.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Government
- Location
- Brewton, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Main Pumping Station Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CONTRACT NO. 1 MAIN PUMPING STATION UPGRADES: The work generally consists of the purchasing and installation of the following: 60 HP Tri-Plex Non-Clog Pumps Equipment; 3- 10 Weighted Arm Check Valves Equipment; 18 Flow Meter Equipment; 18 Plug Valve Equipment; 18 Bypassing Pumping Connection Equipment; Generator; Electrical Modifications; and other related items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Brewton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Government |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
