Main Replacement to Strengthen Hamilton City System
Sector: Steel • Location: San Jose, California, United States of America
Source: California Water Service
Cal Water started a water infrastructure upgrade on Monday, June 6, 2022, in Hamilton City as part of the utility's commitment to ensuring critical infrastructure remains safe and reliable. The project, which comes on the heels of completing another local water system upgrade, will ensure local customers and firefighters continue to have water for their everyday needs and in an emergency. Cal Wate
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Cal Water started a water infrastructure upgrade on Monday, June 6, 2022, in Hamilton City as part of the utility's commitment to ensuring critical infrastructure remains safe and reliable. The project, which comes on the heels of completing another local water system upgrade, will ensure local customers and firefighters continue to have water for their everyday needs and in an emergency. Cal Water will replace 2,950 feet of aging 4-, 5-, and 6-inch steel and AC water mains with 6- and 8-inch PVC pipe, as the existing main is aging and becoming less reliable. Installation will take place on Los Robles Avenue, from 3rd Street to 6th Street, and on Broadway Avenue, from 4th Street to 6th Street. Additionally, the utility plans to replace three fire hydrants and 38 individual customer service connections from the main, and move the mainline location away from the alleyway. The project is expected to be completed by September 2022. Crews will make every effort to minimize traffic delays during construction, which will be performed Monday through Friday between 7 a.m. and 5 p.m. Crews will also minimize any temporary service interruptions required by installing new valves to limit the impact of the shutdowns. Customers will be notified in advance of any planned, temporary shutdowns. Last week, Cal Water finished the installation of 2,530 feet of 6- and 8-inch PVC pipe, replaced 37 individual customer connections, and installed four new fire hydrants on Capay Avenue, 3rd Street, 5th Street, and the surrounding alleys. "These important infrastructure upgrades will enable us to keep delivering the reliable supply of safe, clean water that our Hamilton City customers count on every day," said District Manager Evan Markey. "We look forward to providing even greater fire protection, enhanced water quality, and stronger water system reliability to our community, both now and for generations to come." |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
