Main St, Ketchum - River Street to 10th Street
One of 10,000+ projects Taiyo tracks in Idaho.
Source: Dodge USA
Completed Work will provide the Owner with new curb and gutter and a resurfaced road between River Street and 10th Street. Pavement will consist of 6-inch asphalt, with 2-inches of base course as needed for regrading. Upgraded traffic signals (new mast arms will be installed with new controls (cabinets), signs, and signal heads. Intersection light posts will be replaced at 2nd Street and 4th Stree
- Status
- Closed
- Sector
- Car parking, Road, Automotive, Government, Commercial
- Location
- Ketchum, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Main St, Ketchum - River Street to 10th Street
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Completed Work will provide the Owner with new curb and gutter and a resurfaced road between River Street and 10th Street. Pavement will consist of 6-inch asphalt, with 2-inches of base course as needed for regrading. Upgraded traffic signals (new mast arms will be installed with new controls (cabinets), signs, and signal heads. Intersection light posts will be replaced at 2nd Street and 4th Streets. At 6th Street the lights and poles will be removed, re-painted and replaced on new bases. Wir... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Ketchum |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Automotive, Government, Commercial |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
