Main Street & Whitney Road Utility Replacements
Sector: Water Supply and Storage • Location: Lake Zurich, Illinois, United States of America
Source: Dodge
A) Main Street Beautification project work consists of: 1) 180 of 12 C900 Water Main Installation 2) Lead Service Line Replacements 3) Sanitary Sewer Manhole Replacements 4) Sanitary Sewer Lining 5) Sanitary Sewer Service Replacements 6) Milling, Curb Removal, Sidewalk Removal 7) Street Lighting 8) Concrete Curb, Barrier Curb Planter Boxes, Concrete Base for Brick Pavers, Concrete Sidewalk 9) Bric
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Road, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Waste Processing and Treatment, Automotive, Manufacturing (Industrial)
- Location
- Lake Zurich, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Main Street & Whitney Road Utility Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A) Main Street Beautification project work consists of: 1) 180 of 12 C900 Water Main Installation 2) Lead Service Line Replacements 3) Sanitary Sewer Manhole Replacements 4) Sanitary Sewer Lining 5) Sanitary Sewer Service Replacements 6) Milling, Curb Removal, Sidewalk Removal 7) Street Lighting 8) Concrete Curb, Barrier Curb Planter Boxes, Concrete Base for Brick Pavers, Concrete Sidewalk 9) Brick Paver walkways and crosswalks, Decorative Brick Intersection Emblem 10) Decorative Landscaping,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Lake Zurich |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Waste Processing and Treatment, Automotive, Manufacturing (Industrial) |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
