logo
ProjectDelayed

Main Street Creative Office / Mixed Use Development

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

1.5 acre site comprised of an existing two story commercial building to be renovated to be creative office/retail, a new wood framed five story multi-family building with ground floor retail, and a new manufacturing and production building with above with above grade parking. Total development to contain 72 apartments,66,000 gsf manufacturing and production, and 94 vehicular parking stalls.

Status
Failure
Sector
Manufacturing (Industrial), Road, Residential, Car parking, Commercial, Automotive
Location
Portland, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Main Street Creative Office / Mixed Use Development

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Main Street Creative Office / Mixed Use Development” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Portland, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

1.5 acre site comprised of an existing two story commercial building to be renovated to be creative office/retail, a new wood framed five story multi-family building with ground floor retail, and a new manufacturing and production building with above with above grade parking. Total development to contain 72 apartments,66,000 gsf manufacturing and production, and 94 vehicular parking stalls.

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Portland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Road, Residential, Car parking, Commercial, Automotive

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project