Main Street Lighting Upgrades REBID
Sector: Power Generation (CCGT) • Location: Medford, New Jersey, United States of America
Source: Dodge USA
The project base bid includes the installation of street lights, electrical conduit and wiring, 320 C.Y. flowable fill, 550 tons bituminous base course, 245 tons bituminous surface course paving of roadway, removal of 48 existing street light poles, traffic striping, and related appurtenances on Main Street (County Route 541) between #58 North Main Street and #93 South Main Street. A cable is to e
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Telecommunications, Government, Commercial
- Location
- Medford, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Main Street Lighting Upgrades REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project base bid includes the installation of street lights, electrical conduit and wiring, 320 C.Y. flowable fill, 550 tons bituminous base course, 245 tons bituminous surface course paving of roadway, removal of 48 existing street light poles, traffic striping, and related appurtenances on Main Street (County Route 541) between #58 North Main Street and #93 South Main Street. A cable is to extend across the roadway between two lights for future string lights. Alternate Bid No. 1 include... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Medford |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Telecommunications, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
