Main Street North Water Main Replacement - Phase 2
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The project consists of upsizing of the existing undersized water main along Main Road North in the Town of Elliston. The scope of the project includes replacement of the existing water main with a larger pipe to provide sufficient flow for fire protection. The project aims to provide more reliable firefighting and water service to residents of the Town of Elliston.
- Status
- Closed
- Sector
- Water Supply and Storage, Road
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Main Street North Water Main Replacement - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of upsizing of the existing undersized water main along Main Road North in the Town of Elliston. The scope of the project includes replacement of the existing water main with a larger pipe to provide sufficient flow for fire protection. The project aims to provide more reliable firefighting and water service to residents of the Town of Elliston. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
