Main Street Plaza Watermain Replacement
Sector: Water Supply and Storage • Location: Arnold, Missouri, United States of America
Source: Dodge
MAIN STREET PLAZA WATERMAIN REPLACEMENT Work includes watermain replacement including 6-inch AWWA C900 DR-14 Certa-Lok restrained joint PVC watermain piping, pavement removal and replacement, full height granular backfill, fittings, mechanical restraints, tapping sleeves and valves, line stops, gate valves with valve boxes and lids, fire hydrant assemblies, blowoff assemblies, water service line t
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Commercial, Government
- Location
- Arnold, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Main Street Plaza Watermain Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | MAIN STREET PLAZA WATERMAIN REPLACEMENT Work includes watermain replacement including 6-inch AWWA C900 DR-14 Certa-Lok restrained joint PVC watermain piping, pavement removal and replacement, full height granular backfill, fittings, mechanical restraints, tapping sleeves and valves, line stops, gate valves with valve boxes and lids, fire hydrant assemblies, blowoff assemblies, water service line trimming and/or extending and connection, granular bedding, seed and straw, erosion control, traff... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Arnold |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Commercial, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
