logo
ProjectPlanned

Main Street Storm Sewer Phase 1 Project

Sector: Water Supply and Storage • Location: Glen Carbon, Illinois, United States

Source: The Edwardsville Intelligencer

Project to replace an aging clay pipe storm sewer system from the covered bridge to School Street with new concrete pipe. Pavement will be patched with concrete and resurfaced with hot mix asphalt in 2028 using an STP grant. Utility and pole relocations are anticipated in spring, with construction expected to begin after Homecoming 2026.

Status
Prospective
Sector
Water Supply and Storage, Power Transmission, Bridge, Waste Processing and Treatment, Cement, Road, Power Generation (CCGT)
Location
Glen Carbon, Illinois, United States of America
Updated
22 Jul 2026
Source
The Edwardsville Intelligencer

ConstructChat

Ask ConstructChat about Main Street Storm Sewer Phase 1 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Main Street Storm Sewer Phase 1 Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Glen Carbon, Illinois, United States. Taiyo aggregates data on it from The Edwardsville Intelligencer.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project to replace an aging clay pipe storm sewer system from the covered bridge to School Street with new concrete pipe. Pavement will be patched with concrete and resurfaced with hot mix asphalt in 2028 using an STP grant. Utility and pole relocations are anticipated in spring, with construction expected to begin after Homecoming 2026.

Original sector

Public Infrastructure

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Glen Carbon

Source

Source

The Edwardsville Intelligencer

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Bridge, Waste Processing and Treatment, Cement, Road, Power Generation (CCGT)

Article published date

2026-03-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project