logo

Main Street (U.S. 17) from State Street to Trout River Roadway Improvements

Sector: Road • Location: Jacksonville, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

Hubbard Construction Co was chosen to complete this project which consists of resurfacing, drainage improvements, curbs and gutter work, traffic signal and lighting upgrades, highway signing, guardrails, sidewalks/bicycle path improvements, landscape work, and other incidental construction on North Main Street (US 17) in Duval County from State Street to the Trout River and from East 15th Street t

Project Information FAQ

Project Information

5 Q
The project “Main Street (U.S. 17) from State Street to Trout River Roadway Improvements” is an infrastructure initiative in the Road sector, located in Jacksonville, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Hubbard Construction Co was chosen to complete this project which consists of resurfacing, drainage improvements, curbs and gutter work, traffic signal and lighting upgrades, highway signing, guardrails, sidewalks/bicycle path improvements, landscape work, and other incidental construction on North Main Street (US 17) in Duval County from State Street to the Trout River and from East 15th Street to West 17th Street.Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed within 600 feet of a signalized intersection between the hours of 3 p.m. and 7 p.m. No double lane closures will be allowed from 6 a.m. to 8 p.m. Within school zones on school days, no lane closures are allowed from 1 hour before school begins to 30 minutes after school ends.To view plans for the corridor, please check under the documents tab.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data