Main Street Water and Sewer Phase II
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
Project consists of upgrading the water distribution system and providing a sanitary sewage collection system along a portion of Main Street in the Town of Eastport. The scope of the project includes the replacement of the remaining existing 50 mm diameter water main with a 200 mm diameter water main and the provision of a public sanitary sewer collection system. The project aims to increase the r
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Main Street Water and Sewer Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of upgrading the water distribution system and providing a sanitary sewage collection system along a portion of Main Street in the Town of Eastport. The scope of the project includes the replacement of the remaining existing 50 mm diameter water main with a 200 mm diameter water main and the provision of a public sanitary sewer collection system. The project aims to increase the reliability of the water system as well as implementation of fire protection measures by providing fire flow capacity, and eliminate the presence of untreated sanitary sewer being as a potential contaminant of ground water resources by diverting waste water to the dedicated wastewater treatment plant. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
