logo

Main Street Water Main Replacement

Sector: Water Supply and Storage • Location: New London, New Hampshire, United States of America

Source: Dodge USA

Project
Closed

Installation of approximately 5,600 LF of 12-inch DI water main, 350 LF of 8-inch DI water main to upsize side streets, 250 LF of 6-inch DI fire services and domestic services, asphalt roadway restoration, resetting of granite curbing, and reconstruction of bituminous sidewalk as required on the Contract drawings

Status
Closed
Sector
Water Supply and Storage, Car parking, Road, Government, Automotive, Commercial
Location
New London, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Main Street Water Main Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Main Street Water Main Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in New London, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Installation of approximately 5,600 LF of 12-inch DI water main, 350 LF of 8-inch DI water main to upsize side streets, 250 LF of 6-inch DI fire services and domestic services, asphalt roadway restoration, resetting of granite curbing, and reconstruction of bituminous sidewalk as required on the Contract drawings

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

New London

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Road, Government, Automotive, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project