Main Uranium Processing Facility at Mkuju River Project
Sector: Road • Location: Tanzania
Source: ESI-Africa.com
The main uranium processing facility at the Mkuju River project is planned to have an annual production capacity of up to 3,000 tons of uranium. Construction is slated to begin in the first quarter of 2026, with operations expected to commence in 2029. The project is expected to create around 4,000 new jobs and contribute to regional infrastructure development including road network upgrades in th
- Status
- Prospective
- Sector
- Road, Nuclear, Government
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- ESI-Africa.com
ConstructChat
Ask ConstructChat about Main Uranium Processing Facility at Mkuju River Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main uranium processing facility at the Mkuju River project is planned to have an annual production capacity of up to 3,000 tons of uranium. Construction is slated to begin in the first quarter of 2026, with operations expected to commence in 2029. The project is expected to create around 4,000 new jobs and contribute to regional infrastructure development including road network upgrades in the Namtumbo district. |
Original sector | Mining |
Location
Country | Tanzania |
Source
Source | ESI-Africa.com |
URL |
More Details
Record type | Project |
Sector | Road, Nuclear, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of made-up textile articles, except apparel/GSM FOAM CO LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of basic iron and steel/Quaim Steel Mills Ltd
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of articles of concrete, cement and plaster/Lake Group (Premix)
- Open for FDI through a majority stake/Purchase of new machinery and equipment/Manufacture of machinery for food, beverage and tobacco processing/Tall Welding & Fabrications
- Dar es Salaam Water Distribution
- Tanzania Railways
