logo
ProjectClosed

Main WWTP Secondary Clarifier Rehabilitation Phase 4

One of 10,000+ projects Taiyo tracks in California.

Source: Dodge USA

Work includes: (1) Rehabilitating Clarifiers 4 and 11 by replacing the clarifier equipment, refurbishing the bridge, resurfacing the concrete surfaces, rebuilding drives, refurbishing influent gates, and replacing electrical equipment, (2) installing new sump pits at 5 clarifiers, (3) installing new sump pumps at 6 clarifiers, (4) providing new 120V, 208V, and 480V and control wiring for Clarifier

Status
Closed
Sector
Water Supply and Storage, Commercial, Government, Bridge, Cement, Power Generation (CCGT), Waste Processing and Treatment
Location
Oakland, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Main WWTP Secondary Clarifier Rehabilitation Phase 4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Main WWTP Secondary Clarifier Rehabilitation Phase 4” is an infrastructure initiative in the Water Supply and Storage sector, located in Oakland, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work includes: (1) Rehabilitating Clarifiers 4 and 11 by replacing the clarifier equipment, refurbishing the bridge, resurfacing the concrete surfaces, rebuilding drives, refurbishing influent gates, and replacing electrical equipment, (2) installing new sump pits at 5 clarifiers, (3) installing new sump pumps at 6 clarifiers, (4) providing new 120V, 208V, and 480V and control wiring for Clarifiers 8, 11, and 12, (5) inspecting clarifier return activated sludge pipeline and providing Cure-In-...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Oakland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Government, Bridge, Cement, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project