Maine Transmission Main Upgrades
Sector: Water Supply and Storage • Location: Wilton, Maine, United States of America
Source: Dodge
The Project includes the following Work: Replacing the Intake in Varnum Pond, replacing and upgrading approximately 7,800 feet of raw water transmission main, replacing, upgrading and relocating approximately 15,000 feet of finish water transmission main, construction of a new control valve station, and pump upgrades at the treatment plant.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Government
- Location
- Wilton, Maine, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Maine Transmission Main Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Replacing the Intake in Varnum Pond, replacing and upgrading approximately 7,800 feet of raw water transmission main, replacing, upgrading and relocating approximately 15,000 feet of finish water transmission main, construction of a new control valve station, and pump upgrades at the treatment plant. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maine |
City | Wilton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
