Mainline Optimization Phase 1 (MLO1) Project
Awarded · Canada · Last reported Nov 2025
Source: TS2
Enbridge has taken final investment decision on the Mainline Optimization Phase 1 (MLO1) project, a major expansion of its crude oil network. The project involves a US$1.4 billion capital expenditure to add 150,000 barrels per day on the Mainline system and 100,000 barrels per day on the Flanagan South Pipeline. The incremental capacity is expected to come online in 2027, backed by long-term take-
- Status
- Closed
- Sector
- Oil and Gas
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- TS2
ConstructChat
Ask ConstructChat about Mainline Optimization Phase 1 (MLO1) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Enbridge has taken final investment decision on the Mainline Optimization Phase 1 (MLO1) project, a major expansion of its crude oil network. The project involves a US$1.4 billion capital expenditure to add 150,000 barrels per day on the Mainline system and 100,000 barrels per day on the Flanagan South Pipeline. The incremental capacity is expected to come online in 2027, backed by long-term take-or-pay contracts. |
Original sector | Energy |
Budget |
Location
Country | Canada |
Source
Source | TS2 |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
