logo

Mainstream De Aar Solar Plant

Sector: Commercial • Location: South Africa

Source: World Bank Group

Project
Active

Mainstream Renewable Power De Aar PV (Pty) Ltd. was created to build, own and operate a 50 MW solar PV plant to be located in De Aar, South Africa. The project company was owned by a consortium comprising of Ireland based Mainstream Renewable Power (60%) and assorted South African companies. The project was to consist of 160,000 solar PV panels.

The project was awarded in a tender administered b

Project Information FAQ

Project Information

5 Q
The project “Mainstream De Aar Solar Plant” is an infrastructure initiative in the Commercial sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Mainstream Renewable Power De Aar PV (Pty) Ltd. was created to build, own and operate a 50 MW solar PV plant to be located in De Aar, South Africa. The project company was owned by a consortium comprising of Ireland based Mainstream Renewable Power (60%) and assorted South African companies. The project was to consist of 160,000 solar PV panels. The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012. The tender was open to all technologies, 53 bids were submitted of which 28 made it to preferred bidder status. Under bid rules, at least 35% had to be locally sourced. These 28 project account for a total of 1,416MW if all are implemented. The EIA was passed (as was required for all bidders). There would be a 20 year PPA with the state owned utility, Eskom. total project cost was ZAR 1.2 billion (USD 150 million), with commissioning expected for 2014. http://www.innovationeasterncape.co.za/download/presentation06.pdf http://www.globeleq.com/portfolio/development_projects/5/De-Aar-Solar-PV http://www.sivest.co.za/uploadedDocuments/10273%20-%20Loeriesfontein%20Solar%20Project/Final%20Scoping%20Report/Appendix%203%20Specialist%20Studies/Appendix%20E%20Social%20Impact%20Assessment/CSP%20Kaalspruit%20Draft%20SIA%20Scoping%20Report%20_ver%201_.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data