Mainstream Droogfontein Solar Plant

Sector: Solar • Location: South Africa

Source: World Bank Group

Project
Active

South African Mainstream Renewable Power Droogfontein Pty Ltd was created to build, own and operate a 50 MW solar PV plant to be located in Droogfontein, South Africa. The project company was owned by a consortium comprising of Ireland based Mainstream Renewable Power (60%) and assorted South African companies. The project was expected to generate 89GWh annually.

The project was awarded in a te

Status
Prospective
Sector
Solar, Commercial, Power Generation (CCGT), Power Transmission, Government
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Mainstream Droogfontein Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Mainstream Droogfontein Solar Plant” is an infrastructure initiative in the Solar sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

South African Mainstream Renewable Power Droogfontein Pty Ltd was created to build, own and operate a 50 MW solar PV plant to be located in Droogfontein, South Africa. The project company was owned by a consortium comprising of Ireland based Mainstream Renewable Power (60%) and assorted South African companies. The project was expected to generate 89GWh annually. The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012. The tender was open to all technologies, 53 bids were submitted of which 28 made it to preferred bidder status. These 28 project account for a total of 1,416MW if all are implemented. The EIA was passed (as was required for all bidders). There would be a 20 year PPA with the state owned utility, Eskom. The land was owned by: Droogfontein Communal Property Association, and leased to Mainstream. Solar resource measurements were done for 1 year by GL Garrad Hassan. EIA authorization received in November 2011. PPA was expected to be signed in April 2012. Commissioning was expected for October 2013, construction was expected to start in July 2012. Total project cost was ZAR 1.2 billion (USD 150 million), with commissioning expected for 2014. Senior debt was underwritten by Absa Capital. http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/SA%20Mainstream%20Renewable%20Power%20(Pty)%20Ltd%20Farm%20No_%2062%20Droogfontein.pdf

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Commercial, Power Generation (CCGT), Power Transmission, Government

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project