Maintenance of Polish HERCULES Armored Recovery Fleet
Awarded · Poland · Last reported May 2025
Source: The Defense Post
BAE Systems has partnered with PGZ Capital Group to support the Polish Armed Forces’ M88A2 Heavy Equipment Recovery Combat Utility Lifting Extraction System (HERCULES) vehicles. The project involves utilizing BAE Systems’ intellectual property to assist in the sustainment, repair, and overhaul of the M88A2 fleet, ensuring battlefield readiness.
- Status
- Closed
- Sector
- Aerospace & Defense, Power Transmission, Power Generation (CCGT), Automotive
- Location
- Poznań, Poland
- Updated
- 22 Jul 2026
- Source
- The Defense Post
ConstructChat
Ask ConstructChat about Maintenance of Polish HERCULES Armored Recovery Fleet
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BAE Systems has partnered with PGZ Capital Group to support the Polish Armed Forces’ M88A2 Heavy Equipment Recovery Combat Utility Lifting Extraction System (HERCULES) vehicles. The project involves utilizing BAE Systems’ intellectual property to assist in the sustainment, repair, and overhaul of the M88A2 fleet, ensuring battlefield readiness. |
Original sector | Defense |
Location
Country | Poland |
City | Poznań |
Source
Source | The Defense Post |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Power Transmission, Power Generation (CCGT), Automotive |
Article published date | 2025-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects in Poland
- Grupa Lotos Refinery Upgrade
- LOT REGIONAL AIR TRANSPORT FLEET
- LOT REGIONAL AIR TRANSPORT FLEET II
- An extension of passenger terminal A at the Katowice International Airport in Pyrzowice
- Sulęcin and Friedland: Use and safeguarding of cultural heritage (...)
- Local economic development in airport catchment areas
- Prevention and removal of the effects of climate change through the purchase of vehicles and fire-fighting equipment to fight forest fires
- Muszyna — Sabinov: We strengthen the common cultural heritage of the Polish-Slovak borderland
