Maintenance Yard Enclosure
One of 10,000+ projects Taiyo tracks in Oregon.
Source: Dodge USA
Work includes replacing the existing woven wire fence around the North Bend School District Maintenance Yard with a 10' high solid security wall. The yard is approximately 112 x80 . The enclosure will be constructed with reinforced concrete block (CMU) as Base Bid or embedded steel columns with metal panels as an Alternate Bid. The project includes a motorized vehicle gate, controlled by post moun
- Status
- Prospective
- Sector
- Automotive, Metal, Commercial, Steel, Cement, Government, Manufacturing (Industrial)
- Location
- North Bend, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Maintenance Yard Enclosure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work includes replacing the existing woven wire fence around the North Bend School District Maintenance Yard with a 10' high solid security wall. The yard is approximately 112 x80 . The enclosure will be constructed with reinforced concrete block (CMU) as Base Bid or embedded steel columns with metal panels as an Alternate Bid. The project includes a motorized vehicle gate, controlled by post mounted access control. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | North Bend |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Metal, Commercial, Steel, Cement, Government, Manufacturing (Industrial) |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
