logo

Makassar Seksi IV Toll Road

Active · Indonesia

Source: World Bank Group

Project
Active

The provincial administration of South Sulawesi and city administration of Makassar granted a contract to the private investor PT Bosowa Marga Nusantara to build, own, operate and transfer the Makassar Section IV toll road. PT Jalan Tol Seksi Empat was formed as a special purpose vehicle for the project. The BOT contract was signed on May 29, 2006. The toll road was included in tender for investme

Status
Prospective
Sector
Airport, Road, Bridge, Government, Manufacturing (Industrial), Automotive, Commercial
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Makassar Seksi IV Toll Road

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Makassar Seksi IV Toll Road” is an infrastructure initiative in the Airport sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The provincial administration of South Sulawesi and city administration of Makassar granted a contract to the private investor PT Bosowa Marga Nusantara to build, own, operate and transfer the Makassar Section IV toll road. PT Jalan Tol Seksi Empat was formed as a special purpose vehicle for the project. The BOT contract was signed on May 29, 2006. The toll road was included in tender for investment stage 1. The length of the road was 11.57 km. Makassar (Macassar, Mangkasar), with population of 1.25 million people, was the provincial capital of South Sulawesi, Indonesia, and the largest city on Sulawesi Island. Additional project details were: Length : 11.57 km Design Speed : 80 km/hours Number of Lane : 2 x 3 lane Lane Width : 3 x 3.5 m Outer Shoulder Width : 2.0 m Inner Shoulder Width : 0.5 m Median Width : 3.0 m Right of Way (ROW) : 30.0 m (minimum) Number of Interchange : 1 unit (Kima) Estimated Traffic and Investment Cost Traffic Forecast (2008) : 17,500 vehc./day Investment Cost : US$ 49 Million The toll road was to join the section 1 and 2 of Makassar Toll Road that were already in operation, starting from Tallo Lama Bridge heading to KIMA industrial estate and ending at Mandai towards Hasanuddin Airport. PT Bosowa Marga Nusantara was awarded the project through a competitive tender in which the lowest tariff was the bidding criteria. The number of bidders was unavailable. In April 2007, a loan for IDR 250 billion (US $27.3 million) was secured by PT Jalan Tol Seksi Empat through PT Bank Mega Tbk (Bank Mega) for a period of ten years. Total investment was estimated at US $49 million. It was to be financed 70% through debt and 30% through equity. The road officially opened on Septemeber 29, 2008. http://www.kkppi.go.id/baru/hottopic.php?mode=baca&info_id=3&lang=en&t=Hot%20Topic

Original sector

Transport

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Airport, Road, Bridge, Government, Manufacturing (Industrial), Automotive, Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project