Makkovik Spillway
Completed · Newfoundland and Labrador
Source: Infrastructure Canada
Removal of the existing timber crib and replacing it with a concrete consisting of approximately 180 m3 of reinforced concrete. The work also included some excavation and backfilling involved with the re-location of a portion of an existing lined earth berm. The new structure will replace the existing 20 year old wooden structure which has begun to decay with missing and rotten wooden sections. Co
- Status
- Closed
- Sector
- Forest Products and Packaging, Water Supply and Storage, Cement
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Makkovik Spillway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal of the existing timber crib and replacing it with a concrete consisting of approximately 180 m3 of reinforced concrete. The work also included some excavation and backfilling involved with the re-location of a portion of an existing lined earth berm. The new structure will replace the existing 20 year old wooden structure which has begun to decay with missing and rotten wooden sections. Concrete was chosen over wood for the longevity reasons. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Water Supply and Storage, Cement |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in Canada
- Evanston Centre
- Woodfibre LNG Project, British Columbia
- Aga Khan Museum + Ismaili Centre
- 728 Yonge
- Children's and Women's Clinical Support Building
- Thorold Cogeneration Project Ontario Canada
- Surrey Biofuel Processing Facility Project
- Surrey Memorial Hospital Redevelopment and Expansion: Emergency Department and Critical Care Tower
