Mako Gas Project
Sector: Oil and Gas • Location: Indonesia
Source: TipRanks
The Mako Gas Project in Indonesia involves the development of six wells tied back to a leased mobile offshore production unit with a design capacity of 172 mmscfd. Gas will be fed via a new 59km pipeline into existing regional infrastructure for delivery to the Indonesian domestic market. The project has capital contracts awarded covering over 80% of total projected costs, with a total capex to fi
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- TipRanks
ConstructChat
Ask ConstructChat about Mako Gas Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Mako Gas Project in Indonesia involves the development of six wells tied back to a leased mobile offshore production unit with a design capacity of 172 mmscfd. Gas will be fed via a new 59km pipeline into existing regional infrastructure for delivery to the Indonesian domestic market. The project has capital contracts awarded covering over 80% of total projected costs, with a total capex to first gas estimated at US$320 million on a fully funded basis. The project is on schedule for first gas in Q4 2027. |
Original sector | Energy |
Budget |
Location
Country | Indonesia |
Source
Source | TipRanks |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
