logo
Project

Malawi - Blantyre Water Supply Project

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

It will consist of the following pricipal component: (i) The modification of existing intake and the expansion of raw water intake treatment plant and clear water pumps, as well as the construction of a balancing tank and the provison of surge protection equipment at Walker's Ferry. ii) The construction of a new booster station between Walker's Ferry and Chileka and the pro

Sector
Water Supply and Storage, Automotive, Power Generation (CCGT), Government
Location
Malawi
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Malawi - Blantyre Water Supply Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Malawi - Blantyre Water Supply Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Malawi. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

It will consist of the following pricipal component: (i) The modification of existing intake and the expansion of raw water intake treatment plant and clear water pumps, as well as the construction of a balancing tank and the provison of surge protection equipment at Walker's Ferry. ii) The construction of a new booster station between Walker's Ferry and Chileka and the provision and ecpansion of pumping plants for the new station and for Chileka as well as the construction of balancing tanks. iii) Addition of about 8,000 ft. 27 ins. in diameter and about 7,000 ft. 24 ins. in diameter mains parallel to the existing treated water mains. (iv) Expansion and improvement of the distribution and transmission system by the construction of eight service reservoirs, three break pressure tanks and expansion of distribution pumping stations as well as laying of 182,000 ft. mains ranging in size from 6 ins. (150 mm) to 24 ins. (600 mm) in diameter. (v) Extension of Mudi pumps and pumping station. (vi) Construction of staff housing, laboratory and workshop, the procurement of vehicles, tools accounting machines and mis- cellaneous plant and the training of personnel. (vii) Consulting services for detailed engineering design and supervision and financial management.

Original sector

Energy

Budget

Location

Country

Malawi

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Automotive, Power Generation (CCGT), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project