logo

Malawi - Blantyre Water Supply Project

Sector: Water Supply and Storage • Location: Malawi

Source: African Development Bank (AfDB)

Project

It will consist of the following pricipal component: (i) The modification of existing intake and the expansion of raw water intake treatment plant and clear water pumps, as well as the construction of a balancing tank and the provison of surge protection equipment at Walker's Ferry. ii) The construction of a new booster station between Walker's Ferry and Chileka and the pro

Project Information FAQ

Project Information

4 Q
The project “Malawi - Blantyre Water Supply Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Malawi. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

It will consist of the following pricipal component: (i) The modification of existing intake and the expansion of raw water intake treatment plant and clear water pumps, as well as the construction of a balancing tank and the provison of surge protection equipment at Walker's Ferry. ii) The construction of a new booster station between Walker's Ferry and Chileka and the provision and ecpansion of pumping plants for the new station and for Chileka as well as the construction of balancing tanks. iii) Addition of about 8,000 ft. 27 ins. in diameter and about 7,000 ft. 24 ins. in diameter mains parallel to the existing treated water mains. (iv) Expansion and improvement of the distribution and transmission system by the construction of eight service reservoirs, three break pressure tanks and expansion of distribution pumping stations as well as laying of 182,000 ft. mains ranging in size from 6 ins. (150 mm) to 24 ins. (600 mm) in diameter. (v) Extension of Mudi pumps and pumping station. (vi) Construction of staff housing, laboratory and workshop, the procurement of vehicles, tools accounting machines and mis- cellaneous plant and the training of personnel. (vii) Consulting services for detailed engineering design and supervision and financial management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data