logo
Project

Malawi - Feasibility Study for District Water Supply II

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The consultant will be required to: 1) Make comprehensive assessment of the present and future demands by taking into consideration of such factors as the present population, public, institutional, commercial and industrial water users and making projections of the same. ii) Make a thorough study of the existing water supply and evaluate their reliability to the present and projected District Ce

Sector
Manufacturing (Industrial), Commercial, Water Supply and Storage, Government
Location
Malawi
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Malawi - Feasibility Study for District Water Supply II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Malawi - Feasibility Study for District Water Supply II” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Malawi. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The consultant will be required to: 1) Make comprehensive assessment of the present and future demands by taking into consideration of such factors as the present population, public, institutional, commercial and industrial water users and making projections of the same. ii) Make a thorough study of the existing water supply and evaluate their reliability to the present and projected District Centres requirements. iii) Study the available water resources and formulate a long-term master plan of the development of the water supplies to all the said rural growth centres up to the year 2005, followed by preparation of a phased priority programme of the necessary works to satisfy demand in then year stages. iv) Prepare an overall implementation programme of the centres' water supply and carry out engineering design of the projects initial stage, make economic and financial analysis with an aim of arriving at a clearly defined project which would require minimum further preparation before implementation.

Original sector

Water Supply & Sanitation

Budget

Location

Country

Malawi

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Water Supply and Storage, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project