logo

Malawi - Feasibility Study for District Water Supply II

Sector: Manufacturing (Industrial) • Location: Malawi

Source: African Development Bank (AfDB)

Project

The consultant will be required to: 1) Make comprehensive assessment of the present and future demands by taking into consideration of such factors as the present population, public, institutional, commercial and industrial water users and making projections of the same. ii) Make a thorough study of the existing water supply and evaluate their reliability to the present and projected District Ce

Project Information FAQ

Project Information

4 Q
The project “Malawi - Feasibility Study for District Water Supply II” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Malawi. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The consultant will be required to: 1) Make comprehensive assessment of the present and future demands by taking into consideration of such factors as the present population, public, institutional, commercial and industrial water users and making projections of the same. ii) Make a thorough study of the existing water supply and evaluate their reliability to the present and projected District Centres requirements. iii) Study the available water resources and formulate a long-term master plan of the development of the water supplies to all the said rural growth centres up to the year 2005, followed by preparation of a phased priority programme of the necessary works to satisfy demand in then year stages. iv) Prepare an overall implementation programme of the centres' water supply and carry out engineering design of the projects initial stage, make economic and financial analysis with an aim of arriving at a clearly defined project which would require minimum further preparation before implementation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data