Malawi - Nkula-Lilongwe Power Transmission
Sector: Commercial • Location: Malawi
Source: African Development Bank (AfDB)
The phase I for which Bank assistance is being requested, consists of: (i) The construction of 132 kV transmission line 290 km long, from Nkula Falls via Salima to Lilongwe ; (ii) Building of the transformer/switching stations at Nkula and Lilongwe, equipped with necessary switchgear and protection equipment. Phase II of the proposed 132 kV line Nkula Falls/Salima line to Chinteche, a distance of
- Sector
- Commercial, Power Generation (CCGT), Government
- Location
- Malawi
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Malawi - Nkula-Lilongwe Power Transmission
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The phase I for which Bank assistance is being requested, consists of: (i) The construction of 132 kV transmission line 290 km long, from Nkula Falls via Salima to Lilongwe ; (ii) Building of the transformer/switching stations at Nkula and Lilongwe, equipped with necessary switchgear and protection equipment. Phase II of the proposed 132 kV line Nkula Falls/Salima line to Chinteche, a distance of 251 km; (ii) Building transformer/switching stations at Salima and Chinteche, equipped with necessary switchgear and protection equipment. |
Original sector | Energy |
Budget |
Location
Country | Malawi |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
