logo
Project

Malawi - Shire Valley irrigation project feasability study

Sector: Raw Materials • Location: Malawi

Source: African Development Bank (AfDB)

The present feasability study is initiated by the Government of Malawi (GoM) to permit the development of irrigated agriculture in the Lower Shire Valley as part of the preparatory activities of the Shire Valley Irrigation Project (SVIP). This project aims to improve agricultural productivity and production in a sustainable manner leading to economic growth and reduction of rural poverty in the L

Sector
Raw Materials, Water Supply and Storage, Government
Location
Malawi
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Malawi - Shire Valley irrigation project feasability study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Malawi - Shire Valley irrigation project feasability study” is an infrastructure initiative in the Raw Materials sector, located in Malawi. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present feasability study is initiated by the Government of Malawi (GoM) to permit the development of irrigated agriculture in the Lower Shire Valley as part of the preparatory activities of the Shire Valley Irrigation Project (SVIP). This project aims to improve agricultural productivity and production in a sustainable manner leading to economic growth and reduction of rural poverty in the Lower Shire Valley. The work, in this feasability study, include the following points: (a) updating the 2008 feasibility study, taking account of the findings of the recently completed (May 2012) prefeasibility study funded by AWF and recognizing the opportunity presented by the presence in the project area and (b) undertaking additional work on aspects that have not so far received adequate coverage in the feasibility study. The estimated total cost of the activities is € 5.3 million. Of this amount, AWF will provide a grant of € 1.79 million to cover the cost of the technical feasibility study. GoM will contribute € 73,700 to cover the project management costs and the balance (€ 3.42 million) will be provided by on-going projects financed by the World Bank.

Original sector

Agriculture, Forestry, Fishing

Budget

Location

Country

Malawi

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Water Supply and Storage, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project