logo

Malawi - Shire Valley irrigation project feasability study

Sector: Water Supply and Storage • Location: Malawi

Source: African Development Bank (AfDB)

Project

The present feasability study is initiated by the Government of Malawi (GoM) to permit the development of irrigated agriculture in the Lower Shire Valley as part of the preparatory activities of the Shire Valley Irrigation Project (SVIP). This project aims to improve agricultural productivity and production in a sustainable manner leading to economic growth and reduction of rural poverty in the L

Project Information FAQ

Project Information

4 Q
The project “Malawi - Shire Valley irrigation project feasability study” is an infrastructure initiative in the Water Supply and Storage sector, located in Malawi. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present feasability study is initiated by the Government of Malawi (GoM) to permit the development of irrigated agriculture in the Lower Shire Valley as part of the preparatory activities of the Shire Valley Irrigation Project (SVIP). This project aims to improve agricultural productivity and production in a sustainable manner leading to economic growth and reduction of rural poverty in the Lower Shire Valley. The work, in this feasability study, include the following points: (a) updating the 2008 feasibility study, taking account of the findings of the recently completed (May 2012) prefeasibility study funded by AWF and recognizing the opportunity presented by the presence in the project area and (b) undertaking additional work on aspects that have not so far received adequate coverage in the feasibility study. The estimated total cost of the activities is € 5.3 million. Of this amount, AWF will provide a grant of € 1.79 million to cover the cost of the technical feasibility study. GoM will contribute € 73,700 to cover the project management costs and the balance (€ 3.42 million) will be provided by on-going projects financed by the World Bank.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data