MALAWI-Disaster Risk Management Development Policy Financing with Cat DDO
Closed · Malawi
Source: World Bank Group
The development objective of the Disaster Risk Management (DRM) Development Policy Financing (DPF) with a Catastrophe Deferred Drawdown Option (Cat DDO) Project for Malawi is to strengthen the institutional and financial capacity of the Government of Malawi for multi-sectoral disaster and climate risk management.The Program is structured around three pillars: (i) Strengthening the institutional fr
- Status
- Closed
- Sector
- Road, Commercial, Government, Education
- Location
- Malawi
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about MALAWI-Disaster Risk Management Development Policy Financing with Cat DDO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Disaster Risk Management (DRM) Development Policy Financing (DPF) with a Catastrophe Deferred Drawdown Option (Cat DDO) Project for Malawi is to strengthen the institutional and financial capacity of the Government of Malawi for multi-sectoral disaster and climate risk management.The Program is structured around three pillars: (i) Strengthening the institutional framework and coordination mechanisms for the implementation of the national disaster and climate resilience agenda; (ii) Increasing climate and disaster resilience in physical developments and infrastructure; and (iii) Strengthening adaptive social protection mechanisms and government financial capacity to respond to disasters. |
Original sector | FY17 - Education,FY17 - Health,FY17 - Public Administration,FY17 - Social Protection,FY17 - Transportation |
Budget |
Location
Country | Malawi |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government, Education |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
