logo

Malaysia-Singapore Second Crossing

Sector: Bridge • Location: Johor, Malaysia

Source: World Bank Group

Project
Cancelled

In July 1989, United Engineers (Malaysia) Berhad (UEM) submitted a proposal to the government of Malaysia for the construction of a second road link to Singapore. On 27 July 1993, the government and UEM signed a 30-year BOT contract for the construction of a 2-km bridge, 44km of expressway, and customs and toll facilities. The Second Crossing Expressway connects the bridge to the North-South Expre

Project Information FAQ

Project Information

5 Q
The project “Malaysia-Singapore Second Crossing” is an infrastructure initiative in the Bridge sector, located in Johor, Malaysia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In July 1989, United Engineers (Malaysia) Berhad (UEM) submitted a proposal to the government of Malaysia for the construction of a second road link to Singapore. On 27 July 1993, the government and UEM signed a 30-year BOT contract for the construction of a 2-km bridge, 44km of expressway, and customs and toll facilities. The Second Crossing Expressway connects the bridge to the North-South Expressway, and the Perling Expressway connects to the metropolitan area of Johor Bahru. Cooperation of the Singapore government was obtained on 22 March 1994, and each country is responsible for construction and operation of its side of the bridge according to a common design. In May 1994, UEM handed its contract to a wholly-owned subsidiary, Linkedua (Malaysia) Berhad. Construction started in January 1995, and the bridge opened for operation in early 1998. Construction cost US$ 111 million. The lead underwriter for debt financing was Schroder Wagg.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data