Mali - Baguineda Irrigation Scheme Extension Study
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The present intervention concerns the Baguineda Irrigation Scheme Extension Study. The study aims at producing a blueprint for the development of 1500 ha of useful farm space in extension of the existing Banguineda scheme on the one hand, and at preparing a blueprint for strengthening and extending the main canal to secure the irrigation of existing or future schemes, on the otherhand. The study s
- Sector
- Raw Materials, Water Supply and Storage, Government
- Location
- Mali
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Mali - Baguineda Irrigation Scheme Extension Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present intervention concerns the Baguineda Irrigation Scheme Extension Study. The study aims at producing a blueprint for the development of 1500 ha of useful farm space in extension of the existing Banguineda scheme on the one hand, and at preparing a blueprint for strengthening and extending the main canal to secure the irrigation of existing or future schemes, on the otherhand. The study should also produce detailed sketches, concerning financial and economic feasibility of the project so defined. The project should be carried out in two phases over eleven months, including two periods of two months. The first phase should concentrate on the following reviews and analyses in close collaboration with the parties concerned. The second phase should take five months, including two months for the review and finalization of reports. At the end of each of these phases, a workshop reuniting together representatives of the population, OPAs, NGOs in the area, other donors, government officials and consultations should be organized to discuss proposals contained in the provisional report. |
Original sector | Agriculture, Forestry, Fishing |
Budget |
Location
Country | Mali |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Water Supply and Storage, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Mali
- Mali - Emergency Humanitarian Assistance to Internally Displaced Persons Project (PAHU-PDI)
- Mali - Diversification of the Activities of Moulin moderne du Mali (M3)
- Akuo Kita Solar Photovoltaic Power Plant
- EDM - BOUCLE 225 KV NORD BAMAKO
- Support of the National Programm for Sustainable Small Scale Irrigation
- Support of the national programme for sustainable small-scale agricultural irrigation
- Programme Jeunesse et Stabilisation dans les régions Centre du Mali (Ségou et Mopti)/PROJES
- Integrated agriculture and livestock farming in Gao, Menaka and Mopti
