logo

Mali - Project to Supply Drinking Water to Bamako from the Kabala Locality (PAEP Bamako/Kabala)

Sector: Residential • Location: Mali

Source: African Development Bank (AfDB)

Project

This project, which aims to develop drinking water infrastructure in Bamako, is also part of the Bank's intervention strategy in Mali, defined in the Transition Management Support Strategy Note (NSAGT-2013-2014). The project is expected to contribute to the production of an additional 144,000 cubic meters of water per day, to ensure drinking water supply for the city of Bamako. This volume represe

Project Information FAQ

Project Information

4 Q
The project “Mali - Project to Supply Drinking Water to Bamako from the Kabala Locality (PAEP Bamako/Kabala)” is an infrastructure initiative in the Residential sector, located in Mali. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project, which aims to develop drinking water infrastructure in Bamako, is also part of the Bank's intervention strategy in Mali, defined in the Transition Management Support Strategy Note (NSAGT-2013-2014). The project is expected to contribute to the production of an additional 144,000 cubic meters of water per day, to ensure drinking water supply for the city of Bamako. This volume represents 68% of current production, and will significantly relieve the beneficiaries of the water harvest, especially women. The current low level of drinking water supply in Bamako (36%) greatly justifies the realization of a such project. Pending a supplement to be provided by a second phase planned for 2020, it will increase this rate of access to 60%. In addition to the realization of a treatment station capable of producing the total projected daily volume, and equipped with a warning station to ensure the quality of the water produced, the project will finance (i) 8 water tanks with capacities ranging from 2,000 to 10,000 m3; (ii) a distribution network of 880 Km, representing 53% of the current network; (iii) 66,144 social connections, for the poorest households; and (iv) 1108 standpipes, especially in precarious neighborhoods, the multiplication of these standpipes and their approximation of users contributing to lowering the price of water for these vulnerable populations. The project cost, estimated at UA 238.943 million, will be co-financed with AFD, EU, EIB, WB, IDB, Italian Cooperation and Government. It will executed for 48 months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data