Malikai Deepwater Development Phase 3
One of 232 projects Taiyo tracks in Sabah.
Source: Splash247
The third phase of the Malikai deepwater development involves drilling four oil-producing wells to enhance recoverable oil volumes and sustain liquids production of around 1.4 million barrels per day towards 2030 and beyond. Phase 3 is expected to increase oil production by 60%, from around 25,000 to approximately 40,000 barrels per day, with production starting in the third quarter of 2028. The d
- Status
- Prospective
- Sector
- Oil and Gas
- Location
- Sabah, Malaysia
- Updated
- 19 Nov 2026
- Source
- Splash247
ConstructChat
Ask ConstructChat about Malikai Deepwater Development Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The third phase of the Malikai deepwater development involves drilling four oil-producing wells to enhance recoverable oil volumes and sustain liquids production of around 1.4 million barrels per day towards 2030 and beyond. Phase 3 is expected to increase oil production by 60%, from around 25,000 to approximately 40,000 barrels per day, with production starting in the third quarter of 2028. The development will use the single combo riser technology introduced in earlier phases. |
Original sector | Energy |
Location
Country | Malaysia |
State | Sabah |
Source
Source | Splash247 |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-08-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
