Malitbog Geothermal Power
Sector: Geothermal • Location: Leyte, Philippines
Source: World Bank Group
Geothermal power plant at Malitbog on the island of Leyte is a 231-MW project built in two phases. Phase 1 of 77-MW is in operation. Phase 2 of 154- MW was expected to be operational in 1997. A take-or-pay PPA contract has been signed with Philippines National Oil Co.-Energy Development Corp. (PPOC-EDC). The contract is a 10-year BOT contract sponsored by Credit Suisse and OPIC. OPIC provided poli
- Status
- Closed
- Sector
- Geothermal, Oil and Gas, Power Generation (CCGT), Government, Commercial
- Location
- Leyte, Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Malitbog Geothermal Power
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | concluded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Geothermal power plant at Malitbog on the island of Leyte is a 231-MW project built in two phases. Phase 1 of 77-MW is in operation. Phase 2 of 154- MW was expected to be operational in 1997. A take-or-pay PPA contract has been signed with Philippines National Oil Co.-Energy Development Corp. (PPOC-EDC). The contract is a 10-year BOT contract sponsored by Credit Suisse and OPIC. OPIC provided political risk insurance for debt and CalEnergy, the wholly owner, provided an equity investment of $70 million. Two transmission lines were to be constructed by the Philippine government in 1997: one 200-MW line and one 400-MW line to Luzon. Turnkey facility constructed by Sumitomo Corp. In its fiscal year 1995, MIGA issued $30 million in coverage to Magma Power Company of the United States for its investment in the construction and operation of a 231 MW geothermal conversion facility on the island of Leyte, southeast of Manila. The facility is part of a 440 MW geothermal energy field that will expand Leyte’s generating capacity to 640 MW. In October 2007, Calenergy turnover the Malitbog Geothermal Power to PNOC-EDC which at that time was 60% owned by the government. The plant was turnover after the BOT contract expired. None None |
Original sector | Energy |
Budget |
Location
Country | Philippines |
State | Leyte |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Geothermal, Oil and Gas, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
