Mallard Energy Storage Project
Under construction · Texas · Last reported Dec 2025
Source: Energy News
Peregrine Energy Solutions is constructing a 500 MWh energy storage project near Dallas, Texas. The project uses Wärtsilä's Quantum2 technology and is engineered by WHC Energy Services to enhance the flexibility and reliability of the ERCOT grid. It is part of Peregrine's expansion in large-scale storage in Texas and aims to support grid stability and renewable energy integration.
- Status
- Under Construction
- Sector
- Energy Storage
- Location
- Dallas, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Energy News
ConstructChat
Ask ConstructChat about Mallard Energy Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Peregrine Energy Solutions is constructing a 500 MWh energy storage project near Dallas, Texas. The project uses Wärtsilä's Quantum2 technology and is engineered by WHC Energy Services to enhance the flexibility and reliability of the ERCOT grid. It is part of Peregrine's expansion in large-scale storage in Texas and aims to support grid stability and renewable energy integration. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Texas |
City | Dallas |
Source
Source | Energy News |
URL |
More Details
Record type | Project |
Sector | Energy Storage |
Article published date | 2025-12-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
