logo
ProjectUnder Development

Malmbjerg Molybdenum Project

Sector: Aerospace & Defense • Location: Greenland

Source: Business Wire

The Malmbjerg project is a Climax type primary molybdenum deposit located in central east Greenland. It is an open pit operation with an environmentally friendly mine design focused on reduced water usage, low aquatic disturbance, and low footprint due to modularized infrastructure. The project has an NI 43-101 Definitive Feasibility Study completed in 2022, with a capital expenditure of US$820 mi

Status
Prospective
Sector
Aerospace & Defense, Metal, Water Supply and Storage, Residential
Location
Greenland
Updated
22 Jul 2026
Source
Business Wire

ConstructChat

Ask ConstructChat about Malmbjerg Molybdenum Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Malmbjerg Molybdenum Project” is an infrastructure initiative in the Aerospace & Defense sector, located in Greenland. Taiyo aggregates data on it from Business Wire.

Participants

Not available for this record.

Status

Original status

under development

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Malmbjerg project is a Climax type primary molybdenum deposit located in central east Greenland. It is an open pit operation with an environmentally friendly mine design focused on reduced water usage, low aquatic disturbance, and low footprint due to modularized infrastructure. The project has an NI 43-101 Definitive Feasibility Study completed in 2022, with a capital expenditure of US$820 million, a levered after-tax IRR of 33.8%, and a payback period of 2.4 years, using a US$18 per pound molybdenum price. Proven and Probable Reserves are 245 million tonnes at 0.176% MoS2, for 571 million pounds of contained molybdenum metal. The project aims to supply approximately 25% of the EU's total yearly molybdenum consumption and 100% of EU defense needs.

Original sector

Natural Resources

Budget

Location

Country

Greenland

Source

Source

Business Wire

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Metal, Water Supply and Storage, Residential

Article published date

2026-03-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project