logo

Malmo Loop Farm Development Regional Pump Station Contract 1

Sector: Water Supply and Storage • Location: Leland, North Carolina, United States of America

Source: Dodge USA

Project
Bid Results

The Project consists of the following major items: Construction of a 550 GPM regional wastewater pump station; initial condition is for two (2) pumps with space for addition of a third pump in the future. All site work and appurtenances for the regional wastewater pump station as indicated on the drawings

Status
Closed
Sector
Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
Location
Leland, North Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Malmo Loop Farm Development Regional Pump Station Contract 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Malmo Loop Farm Development Regional Pump Station Contract 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Leland, North Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of the following major items: Construction of a 550 GPM regional wastewater pump station; initial condition is for two (2) pumps with space for addition of a third pump in the future. All site work and appurtenances for the regional wastewater pump station as indicated on the drawings

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Leland

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project