logo
ProjectActive

Malolos–Clark Railway Project (Tranche 2)

One of 10,000+ projects Taiyo tracks in Philippines.

Source: Asian Development Bank (ADB)

Tranche 2 is aligned with the facility's impact: local, national, and international connectivity improved. It will have the following outcome: transport efficiency and capacity along the Manila-Clark corridor improved.The project will deliver two outputs. Tranche 2 will finance the following outputs:(i)Output 1: New railway line commissioned. Tranche 2 will finance the remaining part of the expend

Status
Prospective
Sector
Mass Transit, Residential, Rail, Commercial, Government
Location
Philippines
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Malolos–Clark Railway Project (Tranche 2)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Malolos–Clark Railway Project (Tranche 2)” is an infrastructure initiative in the Mass Transit sector, located in Philippines. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Tranche 2 is aligned with the facility's impact: local, national, and international connectivity improved. It will have the following outcome: transport efficiency and capacity along the Manila-Clark corridor improved.The project will deliver two outputs. Tranche 2 will finance the following outputs:(i)Output 1: New railway line commissioned. Tranche 2 will finance the remaining part of the expenditures for the construction of an elevated double-track railway lines totaling 53.1 km, including the 51.2 km Malolos-Clark-CIA section (Malolos-Clark section), and the 1.9 km Solis-Blumentritt section (Blumentritt extension) linking the project to the existing rail-based public urban transport system in Manila. The Tranche 2 financing includes (a) construction of a depot near CIA for the maintenance of rolling stock and fixed assets, with a training center for railway staff and an operation control center; and (b) seven stations integrating design features that are accessible and safe for the elderly, women, children, and people with disabilities.(ii)Output 2. Institutional capacity strengthened. The tranche will finance the component for the strengthening of DOTr's institutional capacity. The component will (a) start the training program for DOTr staff, of whom 50% are women, in procurement, project and contract management, railway operation, and asset management; (b) establish a system to manage the document and funding flow among all parties involved in project implementation, including technical staff; and (c) fulfill the government's gender and development mandates to ensure the provision of quality railway services to women and marginalized people.

Original sector

Transport

Budget

Location

Country

Philippines

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Mass Transit, Residential, Rail, Commercial, Government

Article published date

2025-07-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project